Construction And Renovations Process in detail.


We typically complete 1 pool a week throughout the year and normal construction time is approximately 6-8 weeks per pool.

Pre-excavation1. Pre-excavation

The pool layout is marked on the ground







Excavation2. Excavation

The dirt is removed







Forms and plumbing3. Forms and plumbing

The construction of the the wooden forms and the plumbing for in floor cleaning begins






Pool Rigid Steel Frame4. Steel

The rigid steel frame is constructed







Concrete shell5. Concrete shell

The shotcrete is applied to the steel frame







Deck preparation6. Deck preparation

The forms are laid and the ground is prepped for the new deck.






outdoor cabana7. Additional features

Other features, such as this outdoor cabana, are constructed in parallel with the pool project






paver decking8. Deck installation

The paver decking is installed







Pool Tile and coping9. Tile and coping

The tile and coping are installed around the perimeter of the pool






plumbing for pool10. Equipment

The equipment is installed and the plumbing completed.







Pool Electrical Connection11. Electrical

The electrical connections are completed







Swimming Pool12. Completion

The project is finished, and ready for swimming







Free Guide - 10 Steps to the PERFECT Pool
Free Guide
Discover the EASY way
to get the PERFECT pool
you've always dreamed of.
  • First Name *
  • E-mail *
  • Zip Code *
  • Comments
  • Please enter the code *
  • captcha



What is on your wishlist?



Need Front or Backyard Hardscape Only?

Look no further, we are here to help. We build patios and patio covers, front steps, retaining walls, outdoor living spaces and more.

Home | About Us | Portfolio | Contact Us | Pool Construction | Free Estimate | Clipboard