Construction And Renovations Process in detail.

 

We typically complete 1 pool a week throughout the year and normal construction time is approximately 6-8 weeks per pool.


Pre-excavation1. Pre-excavation

The pool layout is marked on the ground

 

 

 

 

 

 

Excavation2. Excavation

The dirt is removed

 

 

 

 

 

 

Forms and plumbing3. Forms and plumbing

The construction of the the wooden forms and the plumbing for in floor cleaning begins

 

 

 

 

 

Pool Rigid Steel Frame4. Steel

The rigid steel frame is constructed

 

 

 

 

 

 

Concrete shell5. Concrete shell

The shotcrete is applied to the steel frame

 

 

 

 

 

 

Deck preparation6. Deck preparation

The forms are laid and the ground is prepped for the new deck.

 

 

 

 

 

outdoor cabana7. Additional features

Other features, such as this outdoor cabana, are constructed in parallel with the pool project

 

 

 

 

 

paver decking8. Deck installation

The paver decking is installed

 

 

 

 

 

 

Pool Tile and coping9. Tile and coping

The tile and coping are installed around the perimeter of the pool

 

 

 

 

 

plumbing for pool10. Equipment

The equipment is installed and the plumbing completed.

 

 

 

 

 

 

Pool Electrical Connection11. Electrical

The electrical connections are completed

 

 

 

 

 

 

Swimming Pool12. Completion

The project is finished, and ready for swimming

 

 

 

 

 

 

Free Guide - 10 Steps to the PERFECT Pool
Free Guide
Discover the EASY way
to get the PERFECT pool
you've always dreamed of.
  • First Name *
  • E-mail *
  • Zip Code *
  • Comments
  • Please enter the code *
  • captcha

 

 

What is on your wishlist?

 

 

Need Front or Backyard Hardscape Only?

Look no further, we are here to help. We build patios and patio covers, front steps, retaining walls, outdoor living spaces and more.

APSPCBPBCA
Home | About Us | Portfolio | Contact Us | Pool Construction | Free Estimate | Clipboard